May 30, 2011

Roller Coaster

The 4 jump in Roller coaster (lower section) was repaired today and that concludes the trail repairs after this “special” winter with all the drain pipes, freezing up with ice creating a lot of trouble for us.
Parking an 13,5 ton excavator on the top of a jump, is a good reminder why everything takes so much time with this trail…
Everything in it is huge!


No comments:

Post a Comment