Aug 31, 2011

The landing



We started working our way down what will be the landing for the last step-down in the new section of Roller Coaster. It will lead you straight into a berm -witch turns into a kicker at the end, sending you "up and away" to the landing of the following step-up jump. I really hope we don`t need to go back and fix something in this section anytime soon…

Aug 30, 2011

New step down



This step down will be the last step down in the mid-section of Roller Coaster.
About 2,5 meters high and 8 meters to the sweet spot






Needs a lot of dirt to build a trail with this size ehhh, -everything…
Everything is just bigger :-)




This creek is now going through the kicker in a big tube. Unbelievable how much water there is coming through this area.
Big ditches and enough pipes takes care of that..

Aug 25, 2011

Roller Coaster update


The red dot is where the Roller Coaster Air Downhill has been starting until now.
One step down, one step up and a table left to build before we connected the two sections.We now have 15 meters left before we are past the swamp in the Mid-section of Roller Coaster.



It is massive. This is the landing of the Hip/high speed corner, we are working on right now. The landing will go straight into a step down. Both the hip/corner and the step down have an 8 meter gap but will be pretty mellow to ride. The kickers are pretty slack on both of them.


This is the view looking down the landing of the step down.



This is the view looking up the landing of the step down.

Aug 12, 2011

Progress in Roller Coaster


The awesome weather is helping us a lot making better progress in the mid-section of Roller Coaster.
We are also past the wet area that has been causing so much trouble. This is a high speed corner/ “hip jump into a step down” combo.



This is the massive kicker



No, it is not a road. This is the tranny...